SKU: 646957634

54” I.D. x 20’ S/S 1440psi 4 Phase Skidded Test Separator Package

Sale price$197252505.00 Regular price$219169450.00
Save 10%

Pay in installments of $54792362.50 with ShopPay, AfterPay and Klarna

Shipping Estimate
USA
  • USA
  • CAN

Ships within 48 hours · Estimated delivery Aug 30 - Sep 4

Promo Codes Available:

For Your Every Summer RSVP, with Code: SUMMER15

Description

54” I.D. x 20’ S/S 1440psi 4 Phase Skidded Test Separator PackageFor detailed specifications, please click on the "plus" icon to open each section below General Description: 54 I. D. x 20 S S 1440psi 4 Phase Skidded Test Separator Package Condition: Used Lightly Location: Alberta, Canada Price $300,000 USD each. (3 Identical Units Available) Warranty: No Warranty (Sale is As Is, Where Is Unless Refurbishment Quoted & Accepted) Dimensions: Width 122. 25 (3,105 mm) Length 444 (11,278 mm) Height 132. 25 (3,359 mm)

For detailed specifications, please click on the "plus" icon to open each section below


Description:
54” I.D. x 20’ S/S 1440psi 4 Phase Skidded Test Separator Package

Condition:
Used – Lightly

Location:
Alberta, Canada

Price
$300,000 USD each. (3 Identical Units Available)

Warranty:
No Warranty (Sale is As-Is, Where-Is Unless Refurbishment Quoted & Accepted)

Dimensions:
Width 122.25” (3,105 mm)
Length 444” (11,278 mm)
Height 132.25” (3,359 mm)

Weight:
68,000 lbs (30,844 kg)

Tag:
V-101

Diameter:
54” I.D. (1,372 mm)

Length:
20’ S/S (6,098 mm)

MAWP:
1440 psi (9,928 kPa)

Design Temp:
130 F (54.44 C)

MDMT:
-50 F (-45.55 C)

C/A:
0.125” (3.16 mm)

Volume:
62 BBL (9.86 m3)

Phases:
4 Phase (Two Weirs – First Two Compartments c/w Sparge System)

Orientation:
Horizontal

PWHT:
Yes

Radiography:
RT-1

Year Built:
2012

Built By:
DynaCorp Fabricators

Heating Coil:
Yes – 4” single unit with (2) 1” Fig. 206 inlet/outlet connections

Sparge Piping:
Yes – (2) 1” 600# RF Nozzles c/w Tapped Hub Blind & 1” NPT 6M Ball Valve w/ Hex Plug

NOTE:
In February 2020 the vessel was re-rated to 1360 psi @ 195 F (9,377 kPa @ 90.55 C) through ABSA to achieve a higher vessel design temperature to work on high temperature wells. The original design pressure and temperature is still valid.



NOZZLE SCHEDULE:

ID# SIZE & RATING SERVICE

N1

6” – 600#RF

Inlet

N2

6” – 600#RF

Gas Outlet

N3

3” – 600#RF

PSV

N4

3” – 600#RF

Oil LC

N5 A/B

1” – 600#RF

Oil LG

N6

3” – 600#RF

Oil Outlet

N7

3” – 600#RF

H2O LC

N8 A/B

1” – 600#RF

H2O LG

N9

3” – 600#RF

H2O Outlet

N10 A/B

1” – 600#RF

Inlet LG

N11 A/B

3” – 600#RF

Drains

N12

1” – 600#RF

LSHH

N13

1” – 600#RF

PI

N14

1” – 600#RF

TI

N15

4” – 600#RF

Heat Coil

N16 A/B

1” – 600#RF

Sparge

M1/M2

20” – 600#RF

Manways


Located on the Separator Vessel (V-101) is the following instrumentation:
  • Switch High High (LSHH-101)
  • Level Alarm High (LAH-101)
  • Level Switch Low Low (LSLL-101)
  • Pressure Indicator (PI-100)
  • Pressure Switch Low (PSL-101)
  • Pressure Switch High (PSH-101)
  • Temperature Indicator w/ Thermowell (TI/TW-105)
  • 3” 1502F skid edge connection c/w 3”1502M cap w/ ½” tap & needle valve
  • “M1” Manifold Connection Point
  • Isolation Valve 4” 600# RF Ball Valve
  • Branch connection to Inlet By-Pass Manifold c/w 3” 600# RF Ball Valve
  • Removable flanged cushioned tees for elbows allow quick replacement of blind flange end or entire flange tee in the event of a wash out.
  • ½” High point vent included on top of inlet piping c/w ½” hex plug
  • Inlet Diffuser installed in vessel inlet nozzle
  • Gas Demister installed at vessel gas outlet nozzle
  • 6” 600#RF Gas outlet piping then reduced to 4” 600#RF upstream of gas meters
  • The 4” 600#RF piping is split into two Gas Meters, one is 4” and the other is 2”.
    • Meter #1 (FE-101)
      • (1) 4” 600#RF Flanged V-Cone Gas Meter
      • (2) ½” Full Port ball valves installed on V-Cone pressure taps and SST tubing to 5 valve manifold / flow computer
      • (1) Cameron NUFLO Scanner 2000 microEFM Flow Computer
      • (1) RTD installed d/s of Meter and wired to Scanner 2000
      • (1) Extra thermowell installed downstream of RTD for manual temperature readings
      • (1) 5 valve manifold, Stainless Steel, vented to PSV discharge line
      • (2) Isolation Ball Valves 4” 600#RF installed up & downstream of meter run
    • Gas Meter #2 (FE-102)
      • (1) 2” 600#RF Flanged V-Cone Gas Meter
      • (2) ½” Full Port ball valves installed on V-Cone pressure taps and SST tubing to 5 valve manifold / flow computer
      • (1) Cameron NUFLO Scanner 2000 microEFM Flow Computer
      • (1) RTD installed d/s of Meter and wired to Scanner 2000
      • (1) Extra thermowell installed downstream of RTD for manual temperature readings
      • (1) 5 valve manifold, Stainless Steel, vented to PSV discharge line
      • (2) Isolation Ball Valves 2” 600#RF installed up & downstream of meter run
  • The 4” and 2” 600#RF lines from the gas meters are combined into a single 4” 600#RF line then routed to the Back Pressure Control Valve (BPCV-101).
  • Upstream of the BPCV-101, the piping is branched off into a 3” control valve by-pass.
    • BPCV Isolation
      • (1) Isolation Ball Valve 4” 600#RF installed upstream
      • (1) Isolation Globe Valve 4” 600#RF installed downstream
    • BPCV By-Pass
      • (1) Globe Valve 3” 600#RF
    • Backpressure Control Valve (BPCV-101)
      • (1) 3” 600#RF CVS Control E Series Control Valve
      • c/w CVS 657 Size 45 Direct Acting (Fail Open) Actuator
      • Trim: TBC
    • Pressure Controller (PC-101)
      • (1) Fisher C1 Low Emission Pressure Controller
      • Sensing line tubed to upstream location
      • Supply line tubed from Fuel Gas System
  • The 4” line from BPCV-101 and the 3” 600#RF By-Pass lines are then tied together with a 3” 600#RF line and then run in parallel to skid edge. The 4” line is the “Sales Gas Outlet” and the 3” line is the “Flare Gas Outlet”. Both of these outlets are connected to each other and include isolation valves in the event inline operations need to be switched to flaring.
  • The 4” “Sales Gas” line from BPCV-101 is then reduced to 3” 600#RF and is then branched off into the 3” 600#RF Inlet By-Pass Manifold c/w Isolation Ball Valve 3”600# RF
  • After the branch for the Inlet By-Pass Manifold, the 3” 600#RF “Sales Gas” line is routed to skid edge. Included at skid edge is a 3” 600# RF Isolation Ball Valve then a cross over flange from 3” 600#RF to Fig. 206 M c/w Fig. 206 F Blanking cap for transportation.
  • The 3” 600#RF “Flare Gas” line is routed to skid edge. Included at skid edge is a 3” 600# RF Isolation Ball Valve then a cross over flange from 3” 600#RF to Fig. 206 M c/w Fig. 206 F Blanking cap for transportation.
  • Also included upstream of the isolation ball valve is “M5” Manifold Connection Point.
  • Water Level Control and Level Gauges
    • The water level is controlled using (LC-101) a Fisher L2 liquid level controller using a displacer type sensor to detect the interface of the water and oil phases inside the vessel upstream of the last weir.
    • (2) level gauges “sight glasses” are provided for the water phases in the vessel. LG-101 is located upstream of the first weir and LG-102 is located upstream of the last weir.
      • Both Level Gauges include ½” Drain Ball Valves and are tubed to common drain header and liquid volume gauge board mounted beside Level Gauge.
      • LG-101 consists of (3) sections of TM5 Transparent Level Gauges, (1) Set of two ¾”x1/2” gauge cocks, (2) Isolation Ball Valves ¾” NPT 2M and (2) 1” 600# RF Nozzles c/w Tapped Hub Blind ¾” FNPT
      • LG-102 consists of (2) sections of TM5 Transparent Level Gauges, (1) Set of two ¾”x1/2” gauge cocks, (2) Isolation Ball Valves ¾” NPT 2M and (2) 1” 600# RF Nozzles c/w Tapped Hub Blind ¾” FNPT
  • The water outlet includes a Vortex breaker in vessel.
  • A 3” 600#RF nozzle is used for the water outlet connection. From this nozzle 3” 600#RF piping is routed to both the drain header and water metering / skid edge. Both lines include Isolation Ball Valves. Between the two isolation valves is “K” Chemical Injection Point
  • Downstream of the Isolation valve the 3” 600#RF main water outlet line is branched off into a 2” 600#RF for the flow meter than recombined back into the 3” line. The branch run includes:
    • (2) Isolation Ball Valve 2” 600#RF
    • (2) High Point vents c/w ½” NPT hex plugs
    • (1) Wye- Strainer 2” 600# RF Flanged c/w ½” NPT 2M drain ball valves tubed back into water line downstream of the level control valve.
    • (1) Cameron Nuflo EZ-IN 2” 600#RF wafer style liquid turbine flow meter, c/w magnetic pick up, 3” extension and centralizers
    • (1) Cameron Nuflo MCIII EXP Totalizer
  • After the upstream liquid meter branch connection, the 3” line c/w 3” 600#RF Isolation Ball valves which is Normally Closed. This valve is used when by-passing the liquid meter is required.
  • Once the 2” liquid meter line is recombined into the 3” line, the 3” line is then reduced down to 2” and it is routed to LCV-202 the Water Level Control Valve.
    • Water Level Control Valve (LCV-202)
      • (1) 2” 600#RF Fisher D4 Dump Valve
      • c/w Reserve Acting (Fail Closed) Actuator
      • Trim: TBC
  • After the Water Level Control Valve (LCV-202) the 2” line is increased to 3” 600#RF and is then branched off into the 3” 600#RF Inlet By-Pass Manifold c/w Isolation Ball Valve 3”600# RF
  • The 3” 600#RF “Water Outlet” line is routed to skid edge. Included at skid edge is a 3” 600# RF Isolation Ball Valve then a cross over flange from 3” 600#RF to Fig. 206 M c/w Fig. 206 F Blanking cap for transportation.
  • Also included upstream of the isolation ball valve is “M3” Manifold Connection Point.
  • Oil Level Control and Level Gauge
    • The oil level is controlled using (LC-102) a Fisher L2 liquid level controller using a displacer type sensor to detect the level height of oil phase inside the vessel downstream of the last weir.
    • (1) level gauge “sight glass” are provided for the oil phase in the vessel. LG-103 is located downstream of the last weir.
      • Level Gauge include ½” Drain Ball Valves and is tubed to common drain header and liquid volume gauge board mounted beside Level Gauge.
      • LG-103 consists of (2) sections of TM5 Transparent Level Gauges, (1) Set of two ¾”x1/2” gauge cocks, (2) Isolation Ball Valves ¾” NPT 2M and (2) 1” 600# RF Nozzles c/w Tapped Hub Blind ¾” FNPT
  • The oil outlet includes a Vortex breaker in vessel.
  • A 3” 600#RF nozzle is used for the water outlet connection. From this nozzle 3” 600#RF piping is routed to both the drain header and oil metering / skid edge. Both lines include Isolation Ball Valves. Between the two isolation valves is “Z” Chemical Injection Point
  • Downstream of the Isolation valve the 3” 600#RF main oil outlet line is branched off into a 2” 600#RF for the flow meter than recombined back into the 3” line. The branch run includes:
    • (2) Isolation Ball Valve 2” 600#RF
    • (2) High Point vents c/w ½” NPT hex plugs
    • (1) Wye- Strainer 2” 600# RF Flanged c/w ½” NPT 2M drain ball valves tubed back into the oil line downstream of the level control valve.
    • (1) Cameron Nuflo EZ-IN 2” 600#RF wafer style liquid turbine flow meter, c/w magnetic pick up, 3” extension and centralizers
    • (1) Cameron Nuflo MCIII EXP Totalizer
  • After the upstream liquid meter branch connection, the 3” line c/w 3” 600#RF Isolation Ball valves which is Normally Closed. This valve is used when by-passing the liquid meter is required.
  • Once the 2” liquid meter line is recombined into the 3” line, the 3” line is then reduced down to 2” and it is routed to LCV-201 the Oil Level Control Valve.
    • Oil Level Control Valve (LCV-201)
      • (1) 2” 600#RF Fisher D4 Dump Valve
      • c/w Reserve Acting (Fail Closed) Actuator
      • Trim: TBC
  • After the Oil Level Control Valve (LCV-201) the 2” line is increased to 3” 600#RF and is then branched off into the 3” 600#RF Inlet By-Pass Manifold c/w Isolation Ball Valve 3”600# RF
  • The 3” 600#RF “Oil Outlet” line is routed to skid edge. Included at skid edge is a 3” 600# RF Isolation Ball Valve then a cross over flange from 3” 600#RF to Fig. 206 M c/w Fig. 206 F Blanking cap for transportation.
  • Also included upstream of the isolation ball valve is “M4” Manifold Connection Point.
  • On the upstream side of the first weir (dirty side) there are (2) two 3” 600#RF drain connections on the bottom of the vessel. Each drain connection has an Isolation Ball Valve 3” 600#RF. Between the vessel and isolation valves are Chemical Injection Points “W” and “X” (one each).
  • Downstream of the Isolation Ball Valves the lines are combined into the common drain header and is then branched off into the 3” 600#RF Inlet By-Pass Manifold c/w Isolation Ball Valve 3”600# RF
  • The 3” 600#RF Drain line is routed to skid edge. Included at skid edge is a 3” 600# RF Isolation Ball Valve then a cross over flange from 3” 600#RF to Fig. 206 M c/w Fig. 206 F Blanking cap for transportation.
  • Also included upstream of the isolation ball valve is “M2” Manifold Connection Point.
  • The vessel is fitted with a sparge system designed to accept high pressure water which is routed to a coil on the inside lower portion of the vessel. The high pressure water is sprayed from the sparge coil into the vessel to break up accumulated solids which are removed through the drain nozzles.
  • The vessel and process piping are protected from over pressurization by (1) Pressure Safety Valve (PSV-101). The PSV nozzle on the vessel is 3” 600#RF and piping reduced to 2” upstream of PSV-101.
    • PSV-101 Pressure Safety Valve
      • Axelson Model: 9A-46030-311A35Y
      • 2” 600# RF x 3” 150# RF
      • Pilot Operated
      • G Orifice
      • Set @ 1440 psi (9928 kPa)
      • Capacity: 41,109 SCFM
  • The 3” 150#RF PSV Discharge line is routed to skid edge. Included at skid edge is a cross over flange from 3” 1500#RF to Fig. 206 M c/w Fig. 206 F Blanking cap for transportation.
  • The Instrument Air Scrubber inlet piping starts at Skid edge with 1” NPT Union to be connected to off skid air supply by others. The pressure reducing valve PRV-201 is located on the 1” inlet line and reduces the pressure to take set by the operator.
  • The scrubber and related process piping are protected from over pressurization by (1) Pressure Safety Valve (PSV-103). The PSV is located on the inlet piping of the Instrument Air Scrubber downstream of PRV-103.
    • PSV-103 Pressure Safety Valve
      • Taylor Valve Model: 82E4351311
      • 1” MNPT x 1” FNPT
      • Convention Type PSV
      • E Orifice
      • Set @ 150 psi (1034 kPa)
      • Capacity: 582 SCFM
  • The 1” PSV Discharge line is routed to skid edge and discharges to atmosphere near the roof line.
  • Installed in the outlet of the Instrument Air Scrubber is a high level shut off float. The purpose of this float is that as the vessel fills with liquid, the liquid will raise the float and once it reaches the top of its travel limit the float will block the flow of air out of the scrubber. The benefit to this shut off is that it prevents unwanted liquid from entering the instrumentation air supply lines and eventually entering the instruments and devices.
  • After the high level shut off, there is an instrument air manifold installed on top of the scrubber. Here there are (6) branches, each with its own pressure reducing regulator (PRV-101 to 106). Each of these PRVs is responsible for air supply to a specific instrument.
  • On the top of the instrument air manifold in a pressure indicator (PI-201) c/w ½” NPT needle valve.

Instrument Air Scrubber:

Tag:
V-103

Diameter:
6.065” I.D. (154 mm)

Length:
36” S/S (914 mm)

MAWP:
150 psi (1,034 kPa)

Design Temp:
649 F (343 C)

MDMT:
-20 F (-18.88 C)

C/A:
Nil” (Nil mm)

Volume:
x BBL (x m3)

Phases:
2 Phase

Orientation:
Vertical

PWHT:
No

Radiography:
No

S/N:
1007.11567

Year Built:
2012

Built By:
LO TECH MANUFACTURING

NOZZLE SCHEDULE:
ID# SIZE & RATING SERVICE

N1

1” – CLR 2M

Inlet

N2

1” – CLR 2M

Outlet

N3

3/4” – CLR 2M

Drain


  • This unit is equipment with a chemical injection system that consists of the following equipment
    • (2) Methanol Pumps (P-101 and P-102)
      • Haskel
      • Air Driven
      • Xx GPM (xx LPM)
      • Max Pressure: 10,000 psi (68,950 kPa)
    • (1) Chemical Storage Tank (T-800)
      • 500 gal. (1893 liters)
      • Pressure Relief Valve 7 psi / 0.5 psi Vacuum
  • The 1” NPT outlet line from the Chemical storage tank is routed through a filter than into the Chemical Pumps suction header.
  • The Pumps, HP chemical injection manifold and related tubing lines are protected from over pressurization by (1) Pressure Safety Valve (PSV-301). The PSV is located on the inlet of HP chemical injection manifold downstream of P-101 and P-102.
    • PSV-301 Pressure Safety Valve
      • Brand: Unknown Model: TBC
      • 1/4” MNPT x 1/4” FNPT
      • Set @ 1440 psi (9928 kPa)
  • The 3/8” PSV Discharge Tubing line is routed to the suction header for both pumps.
  • Alarms
    • LAH-101 is wired to exterior mounted Junction Box with a two position hand switch to enable or overside & silence the visual red beacon and audible siren alarm.
  • Shutdowns
    • PSL-101 / PSH-101, LSHH-101 and LSLL-101 are all pneumatic switches which are tubed back to an external mounted Junction Box with panel mounted indicators for Lo Level, Hi Level, Hi/Lo Pressure.
    • This junction box has two tubing connections, the first for air or nitrogen to charge the system and the second is to be connected to a pneumatic actuator mounted on an ESD valve located at the well head on the flow line

Style:
Oilfield Rollend

Width:
122.25” (3,105 mm)

Length:
444” (11,278 mm)

Type:
Unit is fully enclosed in single building

Style:
Foam Panel Construction

Width:
122.25” (3,105 mm)

Length:
444” (11,278 mm)

Height:
132.25” (3,359 mm)

Heaters:
Yes – (2) Electric Ruffneck Model: xxxx

  1. Building can be removed, and gas spools removed for transport to reduce height
  2. Refurbishment, retrofit, repackaging to customer specifications available upon request
Shipping Notes
  • Free Standard Shipping on $100+ Orders to the USA.
  • Except Preorder products are shipped in 48 hours.
  • Delivery to the USA:
  1. Standard Shipping : 3-10 business days
  • If time is of the essence, please consider selecting expedited delivery for faster service.
Exchange/Return Notes
  • We offer a 30-day return/exchange service after receiving.
  • Final sale items are not eligible for returns or exchanges.
  • To process your return/exchange, please contact us at [email protected]
  • Please click here for more details>>> Return & Exchange Policy
SKU: 646957634

Discover Niche Categories That Outsell

Top-Converting Item to Boost Your Average Order

4.8 ★★★★★
Based on 30 reviews
Sort
Highest Rating
Newest First
Oldest First
Product Reviews
A
Ashkan R.
Port Orchard, US
★★★★★ 1
Bad quality
It goes bad after 1 month
WAS THIS REVIEW HELPFUL?YesReportShare
Reviewed in the United States on February 23, 2025
T
Verified Purchase
Tara102375
San Leandro, US
★★★★★ 5
A definite keeper :)
Size: C20 renewed, Size: C20 renewed
I had a shark that gave out after 3 years. (It didn’t have a mop) I ordered a new one from a different company and the new one I bought was defective so when I saw this one half price renewed I figured it couldn’t hurt because this one was only 50 more than the other one. I’m so glad the other brand was defective. This thing is amazing . The app was easy to set up after I realized the quick start card they send has and old obsolete app. Once I searched and found the right app. It’s called eufy clean . All went as planned. There app has so many things to customize. I have a fluffy carpet in my bedroom and was able to set the suction Lower so it wouldn’t damage the carpet. You can customize what rooms it mops , vacuums or if u want both and how many time it will pass through each room 1 or 2 times . I didn’t want a vacuum with a bag but I’m ok with compromising that . The app also has a section to tell u when it’s time to change parts for maintenance. It mapped my small apt very quickly. Its base is larger but it tucks under the base . My shark had no mapping and just bumped randomly around. So always a tapping while it was cleaning. I find this to be much quieter the only time it’s loud is when it returns back to the base ti dump dirt and that is the sound of a regular vacuum running and it’s only for a minute or 2 at tops. I cant speak for battery life because it’s renewed but it cleaned my on bedroom apart in about 40 minutes with 60% battery left. It came in its original box like it was brand new. Only a few indentations on the top of the actual vacuum from what I saw. As for longevity we will see but as of now this renewed item is a definite keeper.
WAS THIS REVIEW HELPFUL?YesReportShare
Reviewed in the United States on March 22, 2026
S
Verified Purchase
Sonia Lea Bodziony
Massapequa, US
★★★★★ 5
Mapping all areas first
Size: C20 renewed
Great vac Quick delivery Easy set up Mop wasn’t responding and customer service was amazing to help troubleshoot and get the problem resolved. A little frustrated at first because the chat wasn’t as helpful and I could not reach them by phone but the email techs replied immediately and promptly responses and help.
WAS THIS REVIEW HELPFUL?YesReportShare
Reviewed in the United States on September 28, 2025
R
Verified Purchase
Recon
Belleville, US
★★★★★ 4
Rattles like a vibrator when it mops after about 2 weeks.
Size: C20 renewed
Works ok. Vacuum beater and opening is only about 6 inches long and the dirt box in the bot is really tiny. Beater is way to tiny to do any real vacuuming on even short shag rugs. The mop works but basically just evenly spreads out whatever dirt is on the floor, evenly across your entire floor and sands the floor with it. After about 2 weeks the bot starts rattling REALLY loud and vibrating like its falling apart. The crazy loud rattling noise is coming from the plastic mop pad axles when they spin. The vacuum bag inside the base is very good quality, but small and not reusable. I cut the far end of the bag down the middle and glued on some velcro strips to each side to re-close it, which allows me to empty the bag and then close it back up again. Pretty sure this thing transmits everything it sees/does back to China.
WAS THIS REVIEW HELPFUL?YesReportShare
Reviewed in the United States on April 30, 2026
C
Verified Purchase
Crystal
West Palm Beach, US
★★★★★ 1
Issues
Size: C20 renewed
Spent all this money for it to consistently have problems. It doesn’t even mop anymore because it keeps saying there is a problem with the sewage tank. I’ve only turned it on less than 5 times and it’s already having issues. Can’t even get it to mop anymore
WAS THIS REVIEW HELPFUL?YesReportShare
Reviewed in the United States on April 25, 2026

recommand products